eld103-2026-q2
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| eld103-2026-q2 [2026/05/06 06:06] – [Thursday April 29 2026] smickster | eld103-2026-q2 [2026/05/13 08:03] (current) – [Tuesday May 12 2026] smickster | ||
|---|---|---|---|
| Line 18: | Line 18: | ||
| * Discussion with James, swapped encoded keyfob, discussed logistics and first day work | * Discussion with James, swapped encoded keyfob, discussed logistics and first day work | ||
| - | ==== Tuesday April 29 2026 ==== | + | ==== Tuesday April 28 2026 ==== |
| * Vacuumed Lobby perimeter | * Vacuumed Lobby perimeter | ||
| Line 29: | Line 29: | ||
| * Vacuumed lobby front entrance threshold and above door removing *some* cobwebs | * Vacuumed lobby front entrance threshold and above door removing *some* cobwebs | ||
| - | ==== Thursday April 29 2026 ==== | + | ==== Thursday April 30 2026 ==== |
| * Assembled dedicated vacuum for onsite storage and use | * Assembled dedicated vacuum for onsite storage and use | ||
| Line 64: | Line 64: | ||
| * Swept various areas of garage extracting dust from concrete seams, partial perimeter and pillars | * Swept various areas of garage extracting dust from concrete seams, partial perimeter and pillars | ||
| * Swept hallway to stairwell of dust and collected fur, debris etc | * Swept hallway to stairwell of dust and collected fur, debris etc | ||
| + | |||
| + | ==== Friday May 08 2026 ==== | ||
| + | |||
| + | * Vacuumed 3rd floor hallway entirely | ||
| + | * Used pick tool to get around railing pillars | ||
| + | * Vacuumed partial stairwell landing and threshold (quick partial pickup) | ||
| + | * Extracted debris from 3rd floor and 4th floor elevator thresholds | ||
| + | * 4th floor scraped and removed floor aberration and chewing gum spot from hallway | ||
| + | * Lobby, scraped up mystery goo from lobby floor | ||
| + | * Cleaned elevator tracks with pick tools | ||
| + | * Basement / parking garage | ||
| + | * Cleaned elevator landing area extensively with rubber broom. | ||
| + | * Swept parking garage areas extensively various spaces, pillars slab edges and more | ||
| + | * moved drain grate positions to mitigate stepping hazard | ||
| + | * Dumped trash bag and replaced liner | ||
| + | |||
| + | ==== Tuesday May 12 2026 ==== | ||
| + | |||
| + | * Used goo-gone and microfiber towel to remove many scattered black smudges on lobby floor | ||
| + | * Vacuumed lobby perimeter, elevator threshold, lobby ramp, under package shelving, entrance threshold | ||
| + | * Vacuumed second floor hallway thoroughly, perimeter, back hallway and most of sitting area | ||
| + | * Extracted debris from elevator track using pick tool and vacuum | ||
| + | * Extracted debris in threshold crack using pick tool and vacuum | ||
| + | * 4th floor, partial vacuum on landing area down to window | ||
| + | * extracted old lodged debris with pick tool in elevator landing area | ||
| + | * worked on gum blots on hallway (no success with goo-gone) | ||
| + | * Retrived key to second floor water closet | ||
| + | * Re-organized and straightened closet, discarded lots of trash | ||
| + | * Migrated some tools and cleaners from closet to cleaning cart | ||
| + | * Moved most cleaning supplies from 2nd floor up to 4th floor | ||
| + | * Parking garage, discarded full trash can liner, replaced with fresh liner | ||
| + | * Threw all garbage in dumpster | ||
| + | * Picked up trash along front walk perimeter | ||
eld103-2026-q2.1778047566.txt.gz · Last modified: by smickster
