User Tools

Site Tools


eld103-2026-q2

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
eld103-2026-q2 [2026/05/11 06:24] – [Friday May 08 2026] smickstereld103-2026-q2 [2026/05/13 08:03] (current) – [Tuesday May 12 2026] smickster
Line 79: Line 79:
     * moved drain grate positions to mitigate stepping hazard     * moved drain grate positions to mitigate stepping hazard
     * Dumped trash bag and replaced liner     * Dumped trash bag and replaced liner
 +
 +==== Tuesday May 12 2026 ====
 +
 +  * Used goo-gone and microfiber towel to remove many scattered black smudges on lobby floor
 +  * Vacuumed lobby perimeter, elevator threshold, lobby ramp, under package shelving, entrance threshold
 +  * Vacuumed second floor hallway thoroughly, perimeter, back hallway and most of sitting area
 +  * Extracted debris from elevator track using pick tool and vacuum
 +  * Extracted debris in threshold crack using pick tool and vacuum
 +  * 4th floor, partial vacuum on landing area down to window
 +    * extracted old lodged debris with pick tool in elevator landing area
 +    * worked on gum blots on hallway (no success with goo-gone)
 +  * Retrived key to second floor water closet
 +  * Re-organized and straightened closet, discarded lots of trash
 +  * Migrated some tools and cleaners from closet to cleaning cart
 +  * Moved most cleaning supplies from 2nd floor up to 4th floor
 +  * Parking garage, discarded full trash can liner, replaced with fresh liner
 +  * Threw all garbage in dumpster
 +  * Picked up trash along front walk perimeter 
eld103-2026-q2.1778480674.txt.gz · Last modified: by smickster

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki