Emptied lobby and garage receptacles, replaced can liners
Re-locked 3rd floor low voltage room, took away trash boxes (old bulbs & door lock boxes)
Brought large heavy sofa delivered box up to 412 to help resident using dolly on freight elevator
Picked trash from front sidewalk to toss with partial bags, creating space
Picked up wind-blown trash on front street, walked perimeter picking up trash
Vacuumed lobby floor and lobby perimeter, elevator thresholds
Vacuumed elevators (2) surface and corners of dog hair
Vacuumed elevator track, both elevators to every floor, 1-8
Vacuumed 8th floor hallway perimeter and both stairwell landings in reach
PIcked up bits of trash, lower parking garage
Vacuumed upper parking garage partial perimeter and a couple pillars of old dust and debris